Completed projects
MAY acquired ownership of an office building for its corporate headquarters in a prestigious area of Moscow.
The class A office building was commissioned as a result of reconstruction.
General characteristics:
- 7 floors, ground floor 6,000 square meters;
- own grounds;
- exclusive project;
- correct architectural forms;
- progressive solutions and materials;
- lots of natural light;
- multi-functional air conditioning and ventilation system;
- multi-level security system;
- individual laconic interior design;
- open space;
- climate control in office;
- ergonomic workstations;
- comfortable meeting rooms of different formats with integrated IT- and media systems;
- cash point and ATM machines;
- meeting rooms available for visitors;
- access control system;
- two modern elevators with minimal waiting time.
Advantageous location allows employees to have a good "work-life" balance:
- Dr.Loder fitness center within walking distance;
- many restaurants and cafes, modern health facilities, museums in close proximity.
Design - March 2011 - November 2011.
Project implementation - December 2011 - November 2012.
Commissioned - December 2012.
MAY warehouse facility
MAY industrial warehouse facility
May-Realty began construction of a warehouse facility on its own grounds in Fryazino (Moscow region) near MAY's main manufacturing center.
Project implementation and reconstruction of industrial units help create a modern industrial warehouse facility with a sound logistics system - "production - warehouse - shipping to outside clients."
General characteristics of the warehouse facility:
- fitted with hi-tech equipment - narrow aisle fork lifts;
- WMS system is implemented;
- modern lifting-loading equipment is used. Storage height - 7 tiers, a non-standard solution.
The project includes construction of a new, five-story administration building fitted with modern engineering systems.
Because shipments will be made by road and rail, MAY built and commissioned its own railway track.
Project stages:
- Design - March 2010 - December 2010.
- Moscow Regional State Expertise approval- January 2011 - March 2011.
- Construction permit - April 2011.
- Project implementation - May 2011 - September 2013.
Commissioned - September 2013
Копия Складской комплекс «Май»
Производственно-Складской комплекс «Май» (ПСК)
Май-Realty приступила к реализации проекта по строительству складского комплекса на собственной территории в г. Фрязино (Московская область), в непосредственной близости от расположения основного производственного центра компании.
Реализация проекта и реконструкция производственных помещений позволят создать современный производственно-складской комплекс с продуманной логистикой «производство — склад — отгрузка внешним клиентам».
Основные характеристики складского комплекса:
- комплекс оборудуется высокотехнологичным оборудованием — узко-проходными штабелерами;
- внедряется WMS – система;
- функционирует современная подъёмно-погрузочная техника. Высота хранения — 7 ярусов, что является нестандартным решением.
В состав проекта входит строительство нового пятиэтажного административно-бытового корпуса, оборудованного современными инженерными системами.
Отгрузки предполагаются как автомобильным, так и железнодорожным транспортом, для чего была построена и введена в эксплуатацию собственная железнодорожная ветка.
Этапы проекта:
- Проектирование — март 2010 г. — декабрь 2010 г.
- Согласование в Мособлгосэкспертизе — январь 2011 г. — март 2011 г.
- Разрешение на строительство — апрель 2011 г.
- Реализация проекта — май 2011 г.— сентябрь 2013 г.
- Сдача в эксплуатацию — сентябрь 2013 г.